Canoa Disaster-Recovery Masterplan

On April 16, 2016, a 7.8 magnitude earthquake struck the coast of Ecuador. Canoa, a small coastal fishing village experienced massive destruction from the earthquake. As engineering consultants for the masterplan team, CGI developed concepts for upgrade of existing infrastructure and development of new infrastructure for the village.

By |2017-03-12T20:21:43-08:00February 19th, 2016|Post Disaster Redevelopment Planning and Engineering, Projects|Comments Off on Canoa Disaster-Recovery Masterplan

Port au Prince, Haiti

Integrated sustainable infrastructure calculations and designs for a 235-hectare post-disaster redevelopment masterplan following the 2010 Haiti earthquake. The infrastructure was in very, very poor condition prior to the earthquake, and was completely destroyed in the earthquake event. The designs contemplated and analyzed three different scenarios for redevelopment: block, corridor and entire core. The infrastructure plans [...]

By |2017-06-14T08:38:00-08:00June 14th, 2010|Post Disaster Redevelopment Planning and Engineering, Projects|Comments Off on Port au Prince, Haiti
Go to Top